Newey Newlands 995kW Biomass Boiler
Project by Bridge Greenhouses
Heating: 995kW Justsen biomass boiler Installation c/w twin wall s/s flue, Heating system installation connecting the new boiler to the existing system, insulation, glasshouse modification to offload the boiler, concrete works for the biomass boiler. Installation of a Javo Toploader fuel store with 4m W & portal height of 5m for the biomass boiler.
Electrics & Control: Biomass boiler, Heating system, Javo Top loader, Hoogendoorn system